Service Interruptions

Here you will find a current list of ongoing and upcoming service interruptions across the campus.

Service Interruptions & Outages

 

 

Date

Location and Work Area

Impact for building residents

Project Manager

3/13

Lennox Hall

 

Olin Hall

 

Palmer Hall

On Friday, March 13, the CC Electric Shop will accompany Pikes Peak Regional Building and Morning Star Elevators as they perform the mandated five-year full load inspections on the lifts in Lennox Hall, Olin Hall, and Palmer Hall.

 Elevators in these buildings may be temporarily unavailable while testing is underway.

 Thank you for your patience as this required inspection is completed.

 

Ben Wirt

Ext 6983

 

 

 

Posted 3/5

 

Date

Location and Work Area

Impact for building residents

Project Manager

4/13 - 4/16

Fine Arts Center – Deco Lounge

Please be advised that the Deco Lounge in the Fine Arts Center will have limited access April 13–16. CC Construction will be onsite replacing the floor behind the bar.

 Please avoid the work area during this time and be mindful of crews and equipment in the space.

 Thank you for your cooperation.

 

James Martinez

Ext 6572

 

 

 

Posted 3/3

 

Date

Location and Work Area

Impact for building residents

Project Manager

Ongoing

Worner

Due to an underground pipe leak, access to the sidewalk along Cascade Avenue east of Worner will be limited.

 Please avoid the fenced work area and be mindful of crews and equipment in the vicinity.

 We appreciate your understanding while repairs are completed.

 

Luke Scott

Ext 6678

 

 

 

Posted 3/2

  

Date

Location and Work Area

Impact for building residents

Project Manager

Ongoing

Packard Hall

Please be advised that several spaces in Packard Hall were impacted by a flood this past Saturday, January 24.

 The following rooms are currently off limits except for authorized personnel:
Rooms 131, 132, 201, 202, 301, and 302.

The basement area and room 203 are functional and accessible.

 Access can be coordinated as needed through EHS (Luke Scott).

 AmeriDri, ARS, and CRDN will be onsite over the coming week to perform remediation work.

 At this time, there is no estimated completion date.

 Thank you for your understanding.

 

Luke Scott

Ext 6678

 

 

 

Updated 1/29

 

Date

Location and Work Area

Impact for building residents

Project Manager

Ongoing

El Diente

EHS responded to a reported flood in Unit #103 and identified a severe sewage backup originating from the kitchen sink. The incident impacted the entire first floor of the unit.

 Immediate mitigation actions are underway and include:

  • Olson Plumbing has cleared the main line and resolved the blockage.
  • AmeriDri has completed sewage extraction and sanitation.
  • Controlled demolition began on December 19, 2025, to remove porous and contaminated materials.

 Due to the nature of this Category 3 (black water) intrusion, all drywall on the first floor is being removed to a 4-foot level, along with affected basement ceiling materials. All first-floor contents, including cabinetry, furniture, carpet, and major appliances, are considered a total loss and will be disposed of. Access to the second floor is currently restricted to prevent cross-contamination.

Unit #103 will remain offline indefinitely.

 There is no estimated timeline for return to service at this time.

Further updates will be provided as remediation progresses.

 Thank you for your cooperation in limiting access to the space.

 

Luke Scott

X6678

 

 

 

 

Updated 1/5

      

Date

Location and Work Area

Impact for building residents

Project Manager

Ongoing

Cornerstone

The men’s restroom on the second floor of Cornerstone, located east of the theater, will be out of service while urinals are being replaced.

 Please plan accordingly. We appreciate your patience during this work.

 

Marcus Moreno

X6915

 

 

 

 

Posted 1/2

 

   

 

Report an issue - Last updated: 03/12/2026