Service Interruptions
Here you will find a current list of ongoing and upcoming service interruptions across the campus.
Service Interruptions & Outages
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
7/13 - 7/14 |
Cascade Ave
Nevada Ave
Cache La Poudre |
Please be advised that Facilities Services will be installing banners using a bucket truck along Cascade Avenue, Nevada Avenue, and Cache la Poudre Street. Work will take place during normal business hours. Please use caution when traveling through these areas and follow any posted signage or directions from personnel. We appreciate your cooperation.
|
Ext 7115 |
|
|
|
|
Posted 7/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
||
|
7/13- 7/15 |
All Campus |
As part of the Fire Alarm Upgrade Project, Facilities will be working with the Colorado Springs Fire Department to test systems across campus. Testing will take place between 8:00 a.m. and 5:00 p.m. Please note that crews will need to enter a random selection of student rooms in each building being tested. We will not know which rooms ahead of time. Thank you for your patience as we complete this important safety work. |
Ben Wirt X 6983
|
|
|
|
|
|
||||
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
7/13 - 7/15 |
1008 N. Weber |
Please be advised we will be replacing the bathroom floor. If you have any concerns or require assistance during this time, please reach out. |
James Martinez Ext 6568 |
|
|
|
|
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
7/14 - 7/20 |
Cutler Quad
Tava Quad
Academic Walkway |
Please be advised that Facilities Services will be installing banners on the light poles in the Cutler Quad, Tava Quad and Academic Walkway using a scissor lift and forklift. These installations will be during normal business hours, Monday through Friday, starting today, Tuesday, July 14th and finishing on Monday, July 20th, weather permitting. Please be extra cautious when passing through these areas and follow any posted warning signs of directions from the Facilities Services staff. Thanks in advance for your cooperation.
|
Ext 6571 |
|
|
|
|
Posted 7/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
5/18 - August |
FAC |
Please be advised that Monument Roofing is currently performing a roofing project at the Fine Arts Center (FAC). This work is necessary to maintain the integrity of the building and help ensure a safe and comfortable environment for everyone. The project is anticipated to continue through early August. We will continue to share updates throughout the duration of the project as information becomes available. What to Expect: Safety Reminders: We appreciate your patience and cooperation as we complete this important project. Our goal is to minimize disruptions while ensuring the work is completed safely and efficiently.
|
Ext 6052 |
|
|
|
|
Updated 5/26 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Spencer Center |
Please be advised that the AC-5 unit serving portions of Spencer Center is currently out of service due to a faulty motherboard. The following areas may experience reduced or no cooling until repairs are completed: Rooms 301 North, 301 South, 301B, 314, 325, 401, 402, 404, and 406. Replacement parts have been ordered, and repairs will be completed as soon as they are received. We appreciate your patience and understanding while this issue is being addressed.
|
Ext 7111 |
|
|
|
|
Posted 7/13 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
El Diente |
Please be advised that the elevator in El Diente is currently out of service. We appreciate your patience and understanding as we ensure the safety and reliability of the elevator. If you have any concerns or require assistance during this time, please reach out.
|
Ext 6983 |
|
|
|
Posted 6/29 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
JLK |
Please be advised that the air conditioning in the kitchen area and upstairs conference room at JLK is currently not functioning. Replacement parts have been ordered; however, due to a parts backlog, the air conditioning will remain out of service until further notice. We appreciate your patience and understanding as we work to restore service as quickly as possible.
|
Ext 7111 |
|
|
|
|
Posted 5/18 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
East Campus Resident Buildings |
We would like to provide an update on the ongoing efforts to restore full functionality to the East Campus heating and cooling system. At this time, all systems other than the heating and cooling system have been restored and are fully functional. Our teams are continuing to work diligently to restore full functionality to the heating and cooling system as quickly as possible. We appreciate your patience and understanding as we work to complete these repairs. Additional updates will be shared as more information becomes available. If you have any concerns or questions, please don’t hesitate to reach out.
|
Ext 6678 |
|
|
|
|
Updated 6/5 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
Armstrong Hall |
The heating system in Armstrong Hall is still out of service due to emergency repairs to the building’s hot water system. Repairs are ongoing, and full heating service has not yet been restored. Please contact Facilities with any questions or concerns. Thank you for your patience and understanding. |
Ext 7115 |
|
|
|
|
Updated 5/5 |
|
Date |
Location and Work Area |
Impact for building residents |
Project Manager |
|
Ongoing |
El Diente |
EHS responded to a reported flood in Unit #103 and identified a severe sewage backup originating from the kitchen sink. The incident impacted the entire first floor of the unit. Immediate mitigation actions are underway and include:
Due to the nature of this Category 3 (black water) intrusion, all drywall on the first floor is being removed to a 4-foot level, along with affected basement ceiling materials. All first-floor contents, including cabinetry, furniture, carpet, and major appliances, are considered a total loss and will be disposed of. Access to the second floor is currently restricted to prevent cross-contamination. Unit #103 will remain offline indefinitely. There is no estimated timeline for return to service at this time. Further updates will be provided as remediation progresses. Thank you for your cooperation in limiting access to the space.
|
X6678
|
|
|
|
|
Updated 1/5 |