Skip to main content area Skip to institutional navigation Skip to sub-navigation

Useful Links

Colorado College’s desire for the campus and surrounding area is complementary to the Long Range Development Plan and other studies recently conducted for the Old North End Neighborhood and downtown Colorado Springs. These plans all reflect a common vision for the area and demonstrate a synergy between these entities to do something that makes a positive impact.


Other Resource Links

Contact Us

For questions or to submit a comment, please send us an email: transportationplan@coloradocollege.edu

Project team

The college has contracted with the local land planning and urban design firm of N.E.S. Inc. to lead the seven-month study. The project team includes:

Project Manager:
N.E.S., Inc.
Tim Seibert

Traffic Engineer:
Felsburg Holt & Ullevig
Todd Frisbie

Design Engineer:
Classic Consulting
Kyle Campbell

Public Involvement:
Bachman pr
Lisa Bachman
Barry Grossman

Colorado College Liaisons:
Robert Moore, CFO
Mike Edmonds, Dean of Students
Leslie Weddell, Communications