Design & Construction Guidelines
If you would like, you can submit feedback about the guidelines below.
| Part 1 - General | Part 2 - Project Phases | Part 3 - Technical Requirements | Sustainability | Appendices |
|---|
Part 1 - General
- 1.01 Working Relationships
- Design Review Board
- Architect, Contractor, Consultants
- Minutes of Meetings
- Project Title, Architect's Invoices
- 1.02 Codes, Regulations, Safety
- Approvals, Corridors, Stairs, Floors & Doors
- Fire Protection / Sprinkler / Suppression
- Fire Hazard Safeguards
- Coiling Doors / Fire Curtains
- Eyewash / Safety Showers
- Asbestos Removal
- Use of Asbestos or Products with Asbestos
- 1.03 Design Considerations
- The Building Program, Classroom Design
- Non-Programmed Space Requirements
- Media Requirements Table
- Provisions for the Handicapped
- Telecommunication Requirements
- Site Considerations
- Climate & Weather Conditions
- 1.04 Space Standards
- Room Numbering System
- Room Numbering Procedures
- Door Numbering Procedures
- Calculating Building Areas
- Gross Area
- Net (Assignable) Area
- 1.05 Miscellaneous
- Federal Agency Participation
- Construction Management / General
- Contractor
Part 2 - Project Phases
- 2.01 Schematic Design Phase
- Submittal Requirements
- Technical Information
- Building / Occupancy Classifications
- Type of Construction
- Allowable Floor Area for Code Analysis
- Height & Number of Stories
- Remodels & Additions
- Building Systems & Materials
- Tabulation of Areas
- Models & Perspective Drawings
- Structural Analysis
- 2.02 Design Development Phase
- Submittal Requirements
- Site, Floor, Roof Plans
- Exterior Elevations
- Building Sections
- Structural Notes / Schematics
- Mechanical, Plumbing Schematics
- HVAC, Electrical Drawings
- Tech Design Development Drawings
- Energy Report
- Tabulation of Areas
- Specification Outline
- 2.03 Construction Documents
- Submittal Requirements
- Drawings
- CD Submittal
- Site Plan CD Submittal
- Demolition Plan, Floor & Roof Plans
- Architectural Exterior Evaluations
- Architectural Building Sections
- Architectural Floor, Reflected Ceiling Plans
- Mechanical / Electrical Plans
- Project Manual & Cost Estimates
- 2.04 Bidding Phase
- General
- 2.05 Construction Phase
- General
- 2.06 Post Construction
- Record Documents
- Post - Occupancy Inspection
Part 3 - Technical Requirements
- 1.0 General Requirements
- 2.0 Site Work
- 3.0 Concrete
- 4.0 Masonry
- 5.0 Metals
- 6.0 Wood & Plastics
- 7.0 Thermal & Moisture Protection
- 8.0 Doors & Windows
- 9.0 Finishes
- 10.0 Specialties
- 11.0 Equipment
- 12.0 Furnishings
- 13.0 Special Construction
- 14.0 Conveying Systems
- 15.0 Mechanical
- 16.0 Electrical
Sustainability
- A. Design Goals
- B. Design Process
- C. Design Guidelines
- Energy Use
- Building materials
- Indoor Environmental Quality
- Site Work
- D. References
Appendices
- A. Standard Drawings
- Code Compliance Plan
- Smart Classroom Basic Model
- Standard Bolland Light
- Standard Pedestrian Pole Light 1
- Standard Pedestrian Pole Light 2
- Standard Pedestrian Pole Light 3
- Standard Site Bench
- Standard Site Litter Receptacle
- Standard Bicycle Rack\
- B. Standard Documents
- Supplemental Conditions to A111
- Supplemental Conditions to A201
- Amendment to B141
- Amendment to B151
- Professional Services Agreement
- C. Standard Forms
- Request for Information
- Request for Information Log
- Proposal Request Log
- Architect Supplemental Instructions Log
- Construction Change Directive Log
- Change Order Log
- Shop Drawing Log
- Consultant Agreement Amendment
- Consultant Application for payment
- Construction Project Acceptance Checklist
- Construction Project Acceptance Notice
- D. Technical Information
- SIMPLEX "iSecure PRO" Security Management System
- SIMPLEZ Fire Alarm System Design Standards
- Outline Specification for Telephone and Data Services
- Outline Specification for Non-Potable Irrigation Piping System
- Outline Specification for Energy Management Control System
- Outline Specification for Chilled Water & HTHW "direct Buried" Distribution Piping Systems
- Outline Specification for Custom Air Handling Units
- Outline Specifications for HTHW Heat Exchangers
- Outline Specifications for HTHW Valves
- Outline Specifications for 'Pre Fab' Underground HTHW Piping
- Outline Specifications for HTHW (Above Grade) Hydronic Piping
Contact Information
Facilities Services
1125 Glen Avenue
Colorado Springs, CO 80905
Phone: (719) 389-6568
Fax: (719) 389-6981
After hours/Emergency Contact
Campus Safety: (719) 389-6707
Hours of Operation
Monday thru Friday, 8:00 a.m. to 5:00 p.m.