Skip to main content area Skip to block navigation Skip to institutional navigation Skip to sub-navigation

Design & Construction Guidelines


If you would like, you can submit feedback about the guidelines below.


Part 1 -
General
Part 2 -
Project Phases
Part 3 -
Technical Requirements
SustainabilityAppendices

Part 1 - General

  • 1.01 Working Relationships
    • Design Review Board
    • Architect, Contractor, Consultants
    • Minutes of Meetings
    • Project Title, Architect's Invoices
  • 1.02 Codes, Regulations, Safety
    • Approvals, Corridors, Stairs, Floors & Doors
    • Fire Protection / Sprinkler / Suppression
    • Fire Hazard Safeguards
    • Coiling Doors / Fire Curtains
    • Eyewash / Safety Showers
    • Asbestos Removal
    • Use of Asbestos or Products with Asbestos
  • 1.03 Design Considerations
    • The Building Program, Classroom Design
    • Non-Programmed Space Requirements
    • Media Requirements Table
    • Provisions for the Handicapped
    • Telecommunication Requirements
    • Site Considerations
    • Climate & Weather Conditions
  • 1.04 Space Standards
    • Room Numbering System
    • Room Numbering Procedures
    • Door Numbering Procedures
    • Calculating Building Areas
    • Gross Area
    • Net (Assignable) Area
  • 1.05 Miscellaneous
    • Federal Agency Participation
    • Construction Management / General
    • Contractor

Part 2 - Project Phases

  • 2.01 Schematic Design Phase
    • Submittal Requirements
    • Technical Information
    • Building / Occupancy Classifications
    • Type of Construction
    • Allowable Floor Area for Code Analysis
    • Height & Number of Stories
    • Remodels & Additions
    • Building Systems & Materials
    • Tabulation of Areas
    • Models & Perspective Drawings
    • Structural Analysis
  • 2.02 Design Development Phase
    • Submittal Requirements
    • Site, Floor, Roof Plans
    • Exterior Elevations
    • Building Sections
    • Structural Notes / Schematics
    • Mechanical, Plumbing Schematics
    • HVAC, Electrical Drawings
    • Tech Design Development Drawings
    • Energy Report
    • Tabulation of Areas
    • Specification Outline
  • 2.03 Construction Documents
    • Submittal Requirements
    • Drawings
    • CD Submittal
    • Site Plan CD Submittal
    • Demolition Plan, Floor & Roof Plans
    • Architectural Exterior Evaluations
    • Architectural Building Sections
    • Architectural Floor, Reflected Ceiling Plans
    • Mechanical / Electrical Plans
    • Project Manual & Cost Estimates
  • 2.04 Bidding Phase
    • General
  • 2.05 Construction Phase
    • General
  • 2.06 Post Construction
    • Record Documents
    • Post - Occupancy Inspection

Part 3 - Technical Requirements


Sustainability

  • A. Design Goals
  • B. Design Process
  • C. Design Guidelines
    1. Energy Use
    2. Building materials
    3. Indoor Environmental Quality
    4. Site Work
  • D. References

Appendices