By the Numbers

3
NUMBER OF STORIES (PLUS MEZZANINE)    
33’ 6”
HEIGHT OF MAIN SPACE CEILING
92
MAXIMUM SEATING CAPACITY OF STUDIO A
Studio A can seat a maximum of 92 people on portable seating.  (Depending on the configuration for productions to be staged, the number may be less.)
106
SCREENING ROOM’S MAXIMUM SEATING CAPACITY    
The screening room will have 102 fixed seats and four wheelchair seats for audience members. The stage area is designed to accommodate a panel discussion in addition to the audience.
451
MAIN AUDITORIUM’S MAXIMUM SEATING CAPACITY
There will be 426 fixed seats plus seven wheelchair seats for a total of 433. An additional 18 portable seats can be set up in the Juliet balconies for a full house.
869
TONS OF STEEL INSTALLED                 
This total includes 255 tons of concrete reinforcing steel.
4,250
CUBIC YARDS OF CONCRETE POURED
The weight equivalent is 8,600 tons.
24,000
CUBIC YARDS OF SOIL EXCAVATED              
Excavated soil was stored at a nearby off-site location and has been brought back to backfill as needed.
28,000
NUMBER OF PROJECT E-MAILS (and still counting)
72,419
TOTAL SQUARE FEET                  
This number includes 7,999 square feet of mechanical basement.
103,000
NUMBERS OF HOURS WORKED (to date)       
35 subcontractors are working for M.A Mortenson on the project.  There are currently about 80 people working on site.
$33,400,000
TOTAL PROJECT COST