Cornerstone Arts Center Construction Site (Added 9/21/06) Colorado College Long Range Development Plan (Added 11/21/06) Colorado College Accessibility Map & Information (Added 12/15/06) Colorado College Custodial Services (Added 12/18/06) Colorado College Facilities Services Design & Construction Guidelines (Added 12/13/04) Contractor & Consultant Guidelines Colorado College Parking Lot Map Services Offered Through Facilities |
Facilities Services Contractor & Consultant Guidelines
Revised: July 13, 2007
i. The Contractor/Consultant shall provide Colorado College Facilities Services advance notice of work in order to allow time to schedule the work with the affected area of the campus. ii. The Contractor/Consultant shall report to the Facilities Services office to obtain permission to begin work, schedule the work, and obtain identification badges and keys.
i. Normal working hours are between 7: 00 am and 5:00 pm, Monday through Friday. ii. When student residences/dormitories are occupied, contractors must be accompanied by College staff, and cannot enter until after 9:00 am. iii. Special arrangements will be made for any work occurring outside of normal working hours. iv. Facilities Services reserves the right to determine actual work schedules to accommodate residential and academic schedules.
i. Keys will be issued only at the Facilities Services office Monday through Friday from 7:30 a.m. to 5 p.m. Identification will be required. ii. Key issues will be completed only from a Contractor Key Card, filled out by the Facilities Project Supervisor, who has requested work by the contractor. Key cards must be submitted to the office in advance for the keys to be ready for issue to the contractor. iii. Keys must be returned to Facilities Service office at the end of each workday and picked up each morning; unless long-term check out is approved by a Facilities project manager. If work is starting earlier, or ending later, or on weekends or holidays, this transaction may be completed at the Security Office, located in Gaylord House, which is staffed 24 hours per day. iv. Keys issued to the contractor are the responsibility of that company. Cost of replacement of locking hardware due to key loss will be charged to the contractor. v. The keys should never be loaned to another individual, as they are the responsibility of the person who has signed for them.
i. Do not prop exterior doors in work area. ii. Areas, materials, and tools should always be secured when leaving the area at any time during the day or at the end of the day. Contractor is responsible for loss of tools or materials.
i. Temporary are available from Karen Crews at the Facilities Office. During the school year, parking is allowed only in marked “Service Vehicle” parking locations. All other marked parking locations are assigned parking spaces for students and college staff, who pay annual parking fees.
i. Work should never commence without a Colorado College purchase order number being issued to the contractor/consultant. A purchase order cannot be issued without a Certificate of Insurance and a W-9, Request for Taxpayer Identification Number and Certification in place with the Facilities Services Office. ii. If you are planning to dig on campus, your company is responsible for requesting from the Utility Notification Center of Colorado. However, those utility or service lines, which are owned by the College, need to be located by College staff. Please call Karen Crews at (719) 389-6276 to request locations. If you go to voice mail, please leave a name and number where you can be reached to give details. A verification notice will be posted on the work site for College technicians to initial that their locations are complete. Excavation cannot begin until each shop representative has initialed this verification form. If form is not initialed, as it should be, please call Karen Crews (719) 389-6276. iii. Before beginning work in the campus area, please determine what services will be interrupted for that area and the staff. Advance Notification of Customers is imperative, so we must be aware of the service interruptions and the lengths of these interruptions. The contact for this notification and coordination of services via Facilities Services is the Office Manager, Karen Crews, at (719) 389-7276. These disruptions include, but are not limited to, noise, vibrations, dust, and interruptions of electric, water, sewer, or gas services. However, do not make any of these decisions without first discussing them with the Facilities project manager. These decisions must be made with sufficient time to notify Departments and allow adequate time to receive replies, questions, or concerns. iv. If computers or phones must be moved, please notify Karen Crews. Be sure to cover any machines or furniture, which have not been removed; i.e., fax machines, desks, chairs, etc. v. Never enter an area to work without notifying Facilities Services that contractor staff will be working there. Contractor staff should wear uniforms or nametags identifying the contracting company for which they work. Nametags are available at the Facilities Services office.
i. Driving on pathways and sidewalks should be avoided if at all possible. If you must use a pathway or sidewalk, speed cannot exceed 5 mph and pedestrians always have the right-of-way. If you have difficulty finding access to a worksite at a College building, please contact Facilities Services at 389-6568 to talk with someone who can show you the safest, most accessible route.
i. Arrangements will be made with Facilities Services to secure a proper area in which to stage equipment and materials for construction. ii. If the contractor requires placement of a storage unit or construction trailer(s) on campus for one or more months, approval must be granted by the Colorado College Project Manager and by the City Planning Department. It is the responsibility of the contractor to gain approval by the City Planning Department. iii. The College prefers to make arrangements for ordering roll-off dumpsters needed for construction. It is requested that the roll-off be emptied before the trash pile exceeds the top of the roll-off, and that the dumpster be removed immediately upon completion of the project.
i. Fencing will be used to protect trees in construction areas. No activity, traffic, or storage of materials under the “drip line” of trees will be allowed without approval of Facilities Services Arborist. ii. Any furniture or office equipment in a construction work area shall be covered to protect from dust.
i. The contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish.
i. Colorado College requires that all construction be in compliance with applicable City, County, State, and Federal safety regulations and code requirements. If you have questions or concerns regarding these regulations or codes, you may contact Kent Clawson, Assistant Director for Environmental Health & Safety, (719) 492-1707, or the Colorado College shop supervisor. ii. Facilities Services will provide testing for hazardous materials in the construction area prior to commencing work.
i. Do not make changes to the original scope of work without prior approval by the College Facilities representative directing the project. ii. Changes in work may be accomplished by Change Order Document and approved by the Facilities Services Project Manager.
i. Upon completion of the work any changes/additions shall be documented on drawings and submitted by the Contractor/Consultant for permanent records. ii. Within 30 days of completion of work, Colorado College Facilities Services must receive pertinent affiliated construction information including but not limited to the following: warranty information, as-built drawings (both reproducible and electronic), O&M manuals (3 copies), list of surplus materials, etc. iii. Colorado College will be given copies of any permits, test results, or other documents of record pertaining to the work. This includes records of any Government approvals or inspections.
i. Payments are made from the original invoice. All invoices need to be mailed or given to Randy Nehls in the Facilities Office. If you have questions concerning purchase orders, invoices, or payment, please call Randy at (719) 389-6569. Under ordinary circumstances, payment will be made within two (2) weeks. ii. Always mail invoices to: Colorado College, Facilities Services, 1125 Glen Avenue, Colorado Springs, Colorado 80905. iii. All invoices must contain the purchase order number, the official project name and the assigned project number, or the name of the building or campus area where work is done. iv. The College is a tax-exempt institution. The contractors are asked to use the College’s tax-exempt number (98-01-691) when purchasing materials for the project. When the tax-exempt number has not been used for materials on larger projects, contractors are asked to collect information, and submit the Colorado Springs Sales and/or Use Tax rebate (ST-19QE) to Facilities Services. The forms and the information required are available at the City of Colorado Springs, Sales Tax Division, 30 South Nevada Avenue, Suite #203, telephone (719) 578-6683. A sample form is also attached. Please collect the applicable data for the College to make a refund request and submit the paperwork to Karen Crews at Facilities Services. v. Itemizing costs 1. Itemize Labor Hours & Labor Cost, Materials, Profit and Overhead separately. 2. Designate as “Partial Billing” or “Final Billing”. 3. For larger projects show percent of “work tasks” or “schedule of values” completed. vi. Costs not to be reimbursed include costs due to the negligence or failure to fulfill a specific responsibility by the Contractor, Subcontractors, and Suppliers or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. vii. Progress billing is required every 30 days and final billing is required within 30 days of work completion. viii. Service Reports are required to be submitted for signature by College representative ordering the service and a copy will be included with the billing.
i. The contact person for payment information is Randy Nehls, (719) 389-6569. ii. Final payment cannot be processed until all College keys, warranties, and documentation are received. iii. If necessary, 10% retainage will be withheld until College keys, warranties, and documentation are received.
i. In case of after hour’s emergencies, the Campus Security phone number is (719) 389-6707. ii. For information or assistance during the workday call either the shop supervisor or Karen Crews at (719) 389-6276. iii. Should the contractor representative encounter problems with individuals on campus, please notify Facilities Services immediately and let them assist you in solving the difficulties. iv. FACILITIES SERVICES ADMINISTRATION CONTACTS· George Eckhardt, Acting Director of Facilities Services (719) 389-6568 · Carl Brandenburg, Campus Architect (719) 389-6568 · Will Wise, Manager of Crafts Shops (719) 389-6978 · Jim Cain, Manager of Technical Services (719) 389-6568 · Ron Smith, Chief of Security (719) 389-6707 · Kent Clawson, Assistant Director for Environmental Health and Safety (719) 389-6678, Emergency/Cell (719)492-1707 · Randy Nehls, Accounts Payable (719) 389-6569
The minimum coverage is: (1) Commercial General Liability General Aggregate $1,000,000 Products – Completed/Operations Aggregate $1,000,000 Personal and Advertising Injury $ 500,000 Each Occurrence $ 500,000 Fire Damage (any one fire) $ 100,000 Medical Expense (any one person) $ 5,000 (2) Automobile Liability Combined Single Limit $ 500,000 (3) Worker’s Compensation Insurance Coverage A – Statutory Limits Coverage B -- $100,000/$500,000/$100,000
|