Facilities Services Department
Design & Construction Guidelines
Appendix C
Appendix C - Standard Forms -
C-2 Request for Information Log
C-4 Architect Supplemental Instructions Log
C-5 Construction Change Directive Log
C-8 Consultant Agreement Amendment
C-9 Consultant Application for Payment
C-10 Construction Project Acceptance Checklist
C-11 Construction Project Acceptance Notice
General:
1.
The type of form necessary will vary with the type of Construction
Contract. The most common Agreement
type for major construction projects is the Construction Manager/General
Contractor.
2. On smaller projects,
the number of required forms can be greatly simplified.
3.
The following reference to “AIA” indicates the most current edition
of the documents as published by the American Institute of Architects.
4.
Similar forms produced by the Architect or Contractor may be substituted
with the approval by the Owner’s Representative.
AMERICAN
INSTITUTE OF ARCHITECTS STANDARD FORMS:
AIA
G701 CHANGE ORDER
AIA
G702 APPLICATION AND CERTIFICATE
FOR PAYMENT; AIA DOCUMENT G703, CONTINUATION SHEET
AIA
G704 CERTIFICATE OF SUBSTANTIAL
COMPLETION
AIA
G706 CONTRACTOR’S AFFIDAVIT OF
PAYMENT OF DEBTS AND CLAIMS (when requested by the Owner)
AIA
G706A CONTRACTOR’S AFFIDAVIT OF
RELEASE OF LIENS
AIA
G707 CONSENT OF SURETY TO FINAL PAYMENT (when requested by the Owner)
AIA
G709 PROPOSAL REQUEST
AIA
G710 ARCHITECT’S SUPPLEMENTAL
INSTRUCTIONS